Technological Problems Regarding the Design and Execution of the New Bridge Over Cibin River in the City of Sibiu and the Bridge Impact in Reducing Pollution in the City Center Area
Author(s): |
Mihai Iliescu
Ştefan I. Guţiu Cătălin Moga |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Procedia Engineering, 2017, v. 181 |
Page(s): | 20-27 |
DOI: | 10.1016/j.proeng.2017.02.358 |
- About this
data sheet - Reference-ID
10669455 - Published on:
28/05/2022 - Last updated on:
28/05/2022