Technological Problems Regarding the Design and Execution of the New Bridge Over Cibin River in the City of Sibiu and the Bridge Impact in Reducing Pollution in the City Center Area
Auteur(s): |
Mihai Iliescu
Ştefan I. Guţiu Cătălin Moga |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Procedia Engineering, 2017, v. 181 |
Page(s): | 20-27 |
DOI: | 10.1016/j.proeng.2017.02.358 |
- Informations
sur cette fiche - Reference-ID
10669455 - Publié(e) le:
28.05.2022 - Modifié(e) le:
28.05.2022