Technical Features of Tsuruta Dam Redevelopment Project
Author(s): |
Koji Sakamoto
Yoshimitsu Takayama Shoichiro Yamamura |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Disaster Research, 1 August 2018, n. 4, v. 13 |
Page(s): | 605-615 |
DOI: | 10.20965/jdr.2018.p0605 |
Abstract: |
In general, redevelopment projects of existing dams can significantly reduce the social, financial, and environmental impacts on a community in comparison to the construction of new dams. In addition, as redevelopment projects of existing dams can accomplish the project purpose more quickly than new construction, the expectation is that such projects will be required more frequently. Tsuruta Dam was constructed in 1966 as a multipurpose dam on the first-class Sendai River. After an unprecedented flood in July 2006, a redevelopment project of the dam began in April of the following year (2007). The project was required to minimize the effect to the flood control function of Tsuruta Dam and to minimize the effects to the power generation company, the dam user. Construction work of the upstream-side cofferdam included a reservoir construction at a significant depth of 60 m or more and a dam body drilling work, and had to be conducted under a complicated and tight schedule. This paper is intended to summarize the Tsuruta Dam redevelopment project as an introduction of the experience and technology obtained and provide some lessons to future redevelopment projects of existing dams. |
- About this
data sheet - Reference-ID
10684921 - Published on:
13/08/2022 - Last updated on:
14/10/2022