0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Technical Features of Tsuruta Dam Redevelopment Project

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Disaster Research, , n. 4, v. 13
Seite(n): 605-615
DOI: 10.20965/jdr.2018.p0605
Abstrakt:

In general, redevelopment projects of existing dams can significantly reduce the social, financial, and environmental impacts on a community in comparison to the construction of new dams. In addition, as redevelopment projects of existing dams can accomplish the project purpose more quickly than new construction, the expectation is that such projects will be required more frequently. Tsuruta Dam was constructed in 1966 as a multipurpose dam on the first-class Sendai River. After an unprecedented flood in July 2006, a redevelopment project of the dam began in April of the following year (2007). The project was required to minimize the effect to the flood control function of Tsuruta Dam and to minimize the effects to the power generation company, the dam user. Construction work of the upstream-side cofferdam included a reservoir construction at a significant depth of 60 m or more and a dam body drilling work, and had to be conducted under a complicated and tight schedule. This paper is intended to summarize the Tsuruta Dam redevelopment project as an introduction of the experience and technology obtained and provide some lessons to future redevelopment projects of existing dams.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.20965/jdr.2018.p0605.
  • Über diese
    Datenseite
  • Reference-ID
    10684921
  • Veröffentlicht am:
    13.08.2022
  • Geändert am:
    14.10.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine