0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

TBM Wienerwald Tunnel

Steps towards Successful Tunnelling

Author(s):


Medium: journal article
Language(s): English
Published in: Geomechanik und Tunnelbau, , n. 6, v. 1
Page(s): 558-566
DOI: 10.1002/geot.200800060
Abstract:

This article reports on incidents and measures which accompanied the implementation of the Wienerwald Tunnel project. The solutions found to problems that arose as work proceeded were important steps towards achieving a successful tunnelling process.

Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200800060.
  • About this
    data sheet
  • Reference-ID
    10031998
  • Published on:
    20/01/2009
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine