TBM Wienerwald Tunnel
Steps towards Successful Tunnelling
Auteur(s): |
G. Zwittnig
M. Diewald K. Hechenblaickner |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Geomechanik und Tunnelbau, 2008, n. 6, v. 1 |
Page(s): | 558-566 |
DOI: | 10.1002/geot.200800060 |
Abstrait: |
This article reports on incidents and measures which accompanied the implementation of the Wienerwald Tunnel project. The solutions found to problems that arose as work proceeded were important steps towards achieving a successful tunnelling process. |
Disponible chez: | Voir chez l'éditeur |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10031998 - Publié(e) le:
20.01.2009 - Modifié(e) le:
30.09.2018