선진시추장비와 시추공벽 영상화 장비를 이용한 TBM 전방 지반평가시스템 개발 (Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment)
This publication has been cited in the following 1 other publication(s):
Advertisement
About this data sheet
Reference-ID 10394838
Published on: 26/11/2019
Last updated on: 26/11/2019
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.