선진시추장비와 시추공벽 영상화 장비를 이용한 TBM 전방 지반평가시스템 개발 (Development for prediction system of TBM tunnel face ahead using probe drilling equipment and drilled hole imaging equipment)
Author(s): |
Ki-Seog Kim
Jong-Hoon Kim Lae-Chul Jeong In-Mo Lee Gye-Chun Cho |
---|---|
Medium: | journal article |
Language(s): | Korean |
Published in: | Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), 31 May 2015, n. 3, v. 17 |
Page(s): | 393-401 |
DOI: | 10.9711/ktaj.2015.17.3.393 |
- About this
data sheet - Reference-ID
10394838 - Published on:
26/11/2019 - Last updated on:
26/11/2019