0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Task planning and control in construction: revealing workers as early and late planners

Author(s): ORCID (Department of Civil Engineering, Aalto University, Espoo, Finland)
ORCID (Department of Civil Engineering, Aalto University, Espoo, Finland)
ORCID (Department of Civil Engineering, Aalto University, Espoo, Finland)
ORCID (Smart Energy and Built Environment, VTT, Finland)
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 5, v. 42
Page(s): 1-20
DOI: 10.1080/01446193.2023.2270080
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2023.2270080.
  • About this
    data sheet
  • Reference-ID
    10743413
  • Published on:
    28/10/2023
  • Last updated on:
    24/04/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine