0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.21315/jcdc2016.21.1.4.
  • About this
    data sheet
  • Reference-ID
    10384997
  • Published on:
    24/11/2019
  • Last updated on:
    24/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine