Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran
Auteur(s): |
Hamed Samarghandi
Seyed Mohammad Moosavi Tabatabaei Pouria Taabayan Ahmad Mir Hashemi Keith Willoughby |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction in Developing Countries, 2016, n. 1, v. 21 |
Page(s): | 51-84 |
DOI: | 10.21315/jcdc2016.21.1.4 |
- Informations
sur cette fiche - Reference-ID
10384997 - Publié(e) le:
24.11.2019 - Modifié(e) le:
24.11.2019