0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Study on Underground Excavation Construction Technology of TBM with Tunnel First Excavated and then Expanded into Platform Based on Double Side Drift Method

This publication lists 22 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10673810
  • Published on:
    29/05/2022
  • Last updated on:
    17/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine