Study on Underground Excavation Construction Technology of TBM with Tunnel First Excavated and then Expanded into Platform Based on Double Side Drift Method
Author(s): |
Guangyao Cui
Hanghang Wei |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geotechnical and Geological Engineering, March 2022, n. 7, v. 40 |
Page(s): | 3595-3605 |
DOI: | 10.1007/s10706-022-02119-4 |
- About this
data sheet - Reference-ID
10673810 - Published on:
29/05/2022 - Last updated on:
17/06/2022