0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Structural Equation Model (SEM) relationship between location and building height and Work Breakdown Structure toward safety costs at rental apartement project

Author(s):

Medium: journal article
Language(s): English
Published in: IOP Conference Series: Materials Science and Engineering, , n. 2, v. 1098
Page(s): 022055
DOI: 10.1088/1757-899x/1098/2/022055
Abstract:

Occupational Health and Safety at the construction is still hampered from the budget side and mindset that OHS is an additional cost. As a result, decisions related to OHS may not be based on ethical considerations and basic rights to a safe workplace, but in the economic field. This study focuses on analyzing the relationship of building location, height of building and work breakdown structure to OHS costs and further reviewing the factors in these variables that are the dominant effect on OHS costs. The purpose of this study is to analyze the factors in each variable that has a dominant effect on occupational health and safety cost and analyze the relationship between location variable, height of building and WBS to the health and safety cost model in at flat construction projects using Structural Equation Model - Partial Least Square (SEM-PLS).

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/1098/2/022055.
  • About this
    data sheet
  • Reference-ID
    10674799
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine