0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Structural Equation Model (SEM) relationship between location and building height and Work Breakdown Structure toward safety costs at rental apartement project

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: IOP Conference Series: Materials Science and Engineering, , n. 2, v. 1098
Seite(n): 022055
DOI: 10.1088/1757-899x/1098/2/022055
Abstrakt:

Occupational Health and Safety at the construction is still hampered from the budget side and mindset that OHS is an additional cost. As a result, decisions related to OHS may not be based on ethical considerations and basic rights to a safe workplace, but in the economic field. This study focuses on analyzing the relationship of building location, height of building and work breakdown structure to OHS costs and further reviewing the factors in these variables that are the dominant effect on OHS costs. The purpose of this study is to analyze the factors in each variable that has a dominant effect on occupational health and safety cost and analyze the relationship between location variable, height of building and WBS to the health and safety cost model in at flat construction projects using Structural Equation Model - Partial Least Square (SEM-PLS).

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1757-899x/1098/2/022055.
  • Über diese
    Datenseite
  • Reference-ID
    10674799
  • Veröffentlicht am:
    12.06.2022
  • Geändert am:
    12.06.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine