Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front
Author(s): |
Daisy X. M. Zheng
S. Thomas Ng |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, February 2005, n. 2, v. 131 |
Page(s): | 176-186 |
DOI: | 10.1061/(asce)0733-9364(2005)131:2(176) |
- About this
data sheet - Reference-ID
10161023 - Published on:
07/12/2018 - Last updated on:
07/12/2018