0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Dewagoda, Kaveesha Gihani / Thomas Ng, S. / Kumaraswamy, Mohan M. (2022): Design for Circularity: The Case of the Building Construction Industry. In: IOP Conference Series: Earth and Environmental Science, v. 1101, n. 6 (1 November 2022).

    https://doi.org/10.1088/1755-1315/1101/6/062026

  2. Yang, Yifan / Thomas Ng, S. / Li, Nan / Xu, Xin / Xu, PengPeng / Xu, Frank J. (2023): Adapting HLA-based co-simulation for interdependent infrastructure resilience management. In: Automation in Construction, v. 150 (June 2023).

    https://doi.org/10.1016/j.autcon.2023.104860

  3. Hossain, Md. Uzzal / Liu, Jin-Cheng / Xuan, Dongxing / Thomas Ng, S. / Ye, Hailong / Abdulla, Safaa J. (2022): Designing sustainable concrete mixes with potentially alternative binder systems: Multicriteria decision making process. In: Journal of Building Engineering, v. 45 (January 2022).

    https://doi.org/10.1016/j.jobe.2021.103587

  4. Hossain, Md. Uzzal / Xuan, Dongxing / Thomas Ng, S. / Amor, Ben (2021): Designing sustainable partition wall blocks using secondary materials: A life cycle assessment approach. In: Journal of Building Engineering, v. 43 (November 2021).

    https://doi.org/10.1016/j.jobe.2021.103035

  5. Dong, Yahong / Thomas Ng, S. / Liu, Peng (2021): A comprehensive analysis towards benchmarking of life cycle assessment of buildings based on systematic review. In: Building and Environment, v. 204 (October 2021).

    https://doi.org/10.1016/j.buildenv.2021.108162

  6. Yang, Yifan / Thomas Ng, S. / Dao, Jicao / Zhou, Shenghua / Xu, Frank J. / Xu, Xin / Zhou, Zhipeng (2021): BIM-GIS-DCEs enabled vulnerability assessment of interdependent infrastructures – A case of stormwater drainage-building-road transport Nexus in urban flooding. In: Automation in Construction, v. 125 (May 2021).

    https://doi.org/10.1016/j.autcon.2021.103626

  7. Thomas Ng, S. / Skitmore, R. Martin / Smith, Nigel J. (1999): Decision‐makers' perceptions in the formulation of prequalification criteria. In: Engineering, Construction and Architectural Management, v. 6, n. 2 (February 1999).

    https://doi.org/10.1108/eb021108

  8. Lam, K. C. / Thomas Ng, S. / Hu, Tiesong / Skitmore, Martin / Cheung, S. O. (2000): Decision support system for contractor pre‐qualification—artificial neural network model. In: Engineering, Construction and Architectural Management, v. 7, n. 3 (March 2000).

    https://doi.org/10.1108/eb021150

  9. Thomas Ng, S. / Wong, Yoki M. W. (2006): Adopting non‐privately funded public‐private partnerships in maintenance projects. A case study in Hong Kong. In: Engineering, Construction and Architectural Management, v. 13, n. 2 (March 2006).

    https://doi.org/10.1108/09699980610659634

  10. Thomas Ng, S. / Wong, James M. W. / Skitmore, Martin (2013): Challenges facing carbon dioxide labelling of construction materials. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 166, n. 1 (February 2013).

    https://doi.org/10.1680/ensu.11.00028

  11. Thomas Ng, S. / Wong, James M. W. / Skitmore, Steven / Veronika, Alin (2012): Carbon dioxide reduction in the building life cycle: a critical review. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 165, n. 4 (December 2012).

    https://doi.org/10.1680/ensu.11.00005

  12. Li, Jun / Thomas Ng, S. / Skitmore, Martin (2018): Developing a decision aid for selecting low-carbon refurbishment solutions for multi-story residential buildings in subtropical cities. In: Energy and Buildings, v. 158 (January 2018).

    https://doi.org/10.1016/j.enbuild.2017.11.066

  13. Zhou, Shenghua / Thomas Ng, S. / Yang, Yifan / Xu, J. Frank (2020): Delineating Infrastructure Failure Interdependencies and Associated Stakeholders through News Mining: The Case of Hong Kong’s Water Pipe Bursts. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000821

  14. Yiu, C. Y. / Lo, S. M. / Thomas Ng, S. / Ng, Michael M. F. (2002): Contractor selection for small building works in Hong Kong. In: Structural Survey, v. 20, n. 4 (October 2002).

    https://doi.org/10.1108/02630800210445690

  15. Mak, Michael Y. / Thomas Ng, S. (2005): The art and science of Feng Shui—a study on architects’ perception. In: Building and Environment, v. 40, n. 3 (March 2005).

    https://doi.org/10.1016/j.buildenv.2004.07.016

  16. Cheung, Sai-On / Suen, Henry C. H. / Thomas Ng, S. / Leung, Mei-yung (2004): Convergent Views of Neutrals and Users about Alternative Dispute Resolution. In: Journal of Management in Engineering (ASCE), v. 20, n. 3 (July 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:3(88)

  17. Aibinu, Ajibade A. / Koch, Fernando / Thomas Ng, S. (2019): Data analytics and big data in construction project and asset management. In: Built Environment Project and Asset Management, v. 9, n. 4 (September 2019).

    https://doi.org/10.1108/bepam-09-2019-139

  18. Zhang, Yanshuai / Thomas Ng, S. (2012): An Ant Colony System Based Decision Support System for Construction Time-cost Optimization. In: Journal of Civil Engineering and Management, v. 18, n. 4 (September 2012).

    https://doi.org/10.3846/13923730.2012.704164

  19. Thomas Ng, S. / Zheng, Daisy X. M. / Xie, Jessie Z. (2013): Allocation of construction resources through a pull‐driven approach. In: Construction Innovation, v. 13, n. 1 (January 2013).

    https://doi.org/10.1108/14714171311296066

  20. Fang, Yuan / Thomas Ng, S. (2011): Applying activity‐based costing approach for construction logistics cost analysis. In: Construction Innovation, v. 11, n. 3 (July 2011).

    https://doi.org/10.1108/14714171111149007

  21. Thomas Ng, S. / Chen, Swee Eng / McGeorge, Denny / Lam, Ka‐Chi / Evans, Simon (2001): Current state of IT usage by Australian subcontractors. In: Construction Innovation, v. 1, n. 1 (March 2001).

    https://doi.org/10.1108/14714170110814479

  22. Zheng, Daisy X. M. / Thomas Ng, S. / Kumaraswamy, Mohan M. (2004): Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(168)

  23. Zheng, Daisy X. M. / Thomas Ng, S. / Kumaraswamy, Mohan M. (2005): Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(81)

  24. Lam, Ka Chi / Thomas Ng, S. (2006): A cooperative Internet-facilitated quality management environment for construction. In: Automation in Construction, v. 15, n. 1 (January 2006).

    https://doi.org/10.1016/j.autcon.2005.01.009

  25. Skitmore, Martin / Thomas Ng, S. (2002): Analytical and Approximate Variance of Total Project Cost. In: Journal of Construction Engineering and Management, v. 128, n. 5 (October 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:5(456)

  26. Thomas Ng, S. / Tang, Ziwei (2008): Delineating the predominant criteria for subcontractor appraisal and their latent relationships. In: Construction Management and Economics, v. 26, n. 3 (March 2008).

    https://doi.org/10.1080/01446190701874405

  27. Thomas Ng, S. / Fan, Ryan Y. C. / Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. / Lam, Patrick T. I. / Kumaraswamy, Mohan (2009): Coping with structural change in construction: experiences gained from advanced economies. In: Construction Management and Economics, v. 27, n. 2 (February 2009).

    https://doi.org/10.1080/01446190802699040

  28. Leung, Mei‐Yung / Thomas Ng, S. / Skitmore, Martin / Cheung, Sai‐On (2005): Critical stressors influencing construction estimators in Hong Kong. In: Construction Management and Economics, v. 23, n. 1 (January 2005).

    https://doi.org/10.1080/01446190410001678099

  29. Leung, Mei-yung / Chong, Alice / Thomas Ng, S. / Cheung, Michael C. K. (2004): Demystifying stakeholders' commitment and its impacts on construction projects. In: Construction Management and Economics, v. 22, n. 7 (September 2004).

    https://doi.org/10.1080/0144619042000300736

  30. Chow, Lai Kit / Thomas Ng, S. (2010): Delineating the performance standards of engineering consultants at design stage. In: Construction Management and Economics, v. 28, n. 1 (January 2010).

    https://doi.org/10.1080/01446190903450053

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine