Steuerbare Einwirkungen auf Kranbahnen
Author(s): |
Reiner Thoß
|
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, January 2011, n. 1, v. 80 |
Page(s): | 39-45 |
DOI: | 10.1002/stab.201190002 |
Abstract: |
Controlling the actions on crane gantries.When analysing the actions on a crane gantry, there is some leeway on the crane side, but the actions that may be applied to an existing crane gantry are fixed unless constructional changes are made. In particular, when new cranes, often with higher safe working loads, are to be mounted on existing crane gantries, the loadbearing reserves should not be sought solely in the gantry, but instead primarily in the crane itself, or rather its parameters. |
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10064027 - Published on:
11/02/2011 - Last updated on:
13/08/2014