0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Spatial analysis leveraging machine learning and GIS of socio-geographic factors affecting cost overrun occurrence in roadway projects

This publication lists 41 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10638090
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine