0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Spatial analysis leveraging machine learning and GIS of socio-geographic factors affecting cost overrun occurrence in roadway projects

Author(s):


Medium: journal article
Language(s): English
Published in: Automation in Construction, , v. 133
Page(s): 104007
DOI: 10.1016/j.autcon.2021.104007
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.autcon.2021.104007.
  • About this
    data sheet
  • Reference-ID
    10638090
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine