Some examples for the selection of tunnelling methods / Wahl der Vortriebsmethode anhand von Beispielen
Author(s): |
Markus Spiegl
Eckart Schneider |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 5, v. 4 |
Page(s): | 508-516 |
DOI: | 10.1002/geot.201100040 |
Abstract: |
Today it is necessary to systematically consider the selection of the tunnelling method at a very early stage of a project. These early considerations regarding the construction method are usually necessary because of the approval (e.g. EIA) or award regulations, or are essential for the evaluation of tenders. The quite different procedures that can be applied on individual projects are illustrated through three examples. |
Keywords: |
risk assessment risk analysis tunneling method criteria catalogue risk catalogue
|
Available from: | Refer to publisher |
Structure Types
- About this
data sheet - Reference-ID
10065748 - Published on:
06/10/2011 - Last updated on:
13/08/2014