Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
Author(s): |
Lianying Zhang
Jingjing Du Shushan Zhang |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), March 2014, n. 2, v. 30 |
Page(s): | 163-172 |
DOI: | 10.1061/(asce)me.1943-5479.0000189 |
- About this
data sheet - Reference-ID
10371972 - Published on:
29/08/2019 - Last updated on:
29/08/2019