Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization
Auteur(s): |
Lianying Zhang
Jingjing Du Shushan Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Management in Engineering (ASCE), mars 2014, n. 2, v. 30 |
Page(s): | 163-172 |
DOI: | 10.1061/(asce)me.1943-5479.0000189 |
- Informations
sur cette fiche - Reference-ID
10371972 - Publié(e) le:
29.08.2019 - Modifié(e) le:
29.08.2019