0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Simulation Analysis and Application of Super High-rise Tower Construction Process

Author(s):




Medium: journal article
Language(s): English
Published in: Journal of Physics: Conference Series, , n. 1, v. 2185
Page(s): 012065
DOI: 10.1088/1742-6596/2185/1/012065
Abstract:

Wenzhou Lucheng Square Phase IV project, whose main tower reaching 378.8m high, belongs to the super high-rise building structure. Considering the influence of shrinkage and creep characteristics of concrete on vertical deformation differences of components, Midas Gen was used to simulate and analyze the whole construction process of the main tower. The analysis results of different working conditions are compared, the rationality of the construction scheme is checked and a general conclusion is drawn.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1742-6596/2185/1/012065.
  • About this
    data sheet
  • Reference-ID
    10670882
  • Published on:
    03/06/2022
  • Last updated on:
    03/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine