Simulation Analysis and Application of Super High-rise Tower Construction Process

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Physics: Conference Series, , n. 1, v. 2185
Page(s): 012065
DOI: 10.1088/1742-6596/2185/1/012065
Abstrait:

Wenzhou Lucheng Square Phase IV project, whose main tower reaching 378.8m high, belongs to the super high-rise building structure. Considering the influence of shrinkage and creep characteristics of concrete on vertical deformation differences of components, Midas Gen was used to simulate and analyze the whole construction process of the main tower. The analysis results of different working conditions are compared, the rationality of the construction scheme is checked and a general conclusion is drawn.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1742-6596/2185/1/012065.
  • Informations
    sur cette fiche
  • Reference-ID
    10670882
  • Publié(e) le:
    03.06.2022
  • Modifié(e) le:
    03.06.2022
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine