Selection of tunnelling methods for the New Semmering Base Tunnel / Auswahl der Vortriebsmethode beim Semmering-Basistunnel neu
Author(s): |
Zafer Ekici
Christoph Rüegg Nicole Wilfinger Oliver K. Wagner Johannes Weigl |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 5, v. 4 |
Page(s): | 544-552 |
DOI: | 10.1002/geot.201100037 |
Abstract: |
The approved alignment of the "New Semmering Base Tunnel" was divided into sections according to the three aspects risk, geotechnics and construction operations, in which either only sequential tunnelling or both methods, sequential or continuous mechanised, could be used. |
Keywords: |
risk assessment risk analysis tunneling methods construction operation
|
Available from: | Refer to publisher |