0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Selection of government supervision mode of PPP projects during the operation stage

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 10, v. 37
Page(s): 1-20
DOI: 10.1080/01446193.2018.1564347
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2018.1564347.
  • About this
    data sheet
  • Reference-ID
    10300484
  • Published on:
    28/06/2019
  • Last updated on:
    06/10/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine