0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Bu, Zehui / Liu, Jicai / Liu, Jiaqi: Impact of emotions on the behavioral strategies of PPP project stakeholders: an RDEU evolutionary game analysis. In: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-03-2023-0262

  2. Liu, Jiaqi / Liu, Jicai (2022): The demand hierarchy of the government and investors in PPP projects. In: Engineering, Construction and Architectural Management, v. 31, n. 4 (December 2022).

    https://doi.org/10.1108/ecam-01-2022-0052

  3. Liu, Jiaqi / Liu, Jicai / Bu, Zehui (2022): Effects of Different Face-Saving Concerns on the Escalation of Commitment between State-Owned and Private Investors in PPP Projects. In: Journal of Construction Engineering and Management, v. 148, n. 9 (September 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002365

  4. Zhang, Xiaoxue / Liu, Jicai (2022): Incentive Mechanism and Value-Added in PPP Projects Considering Financial Institutions’ Early Intervention. In: Journal of Construction Engineering and Management, v. 148, n. 4 (April 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002248

  5. Liu, Jicai / Gao, Ruolan / Cheah, Charles Yuen Jen (2017): Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory. In: Journal of Management in Engineering (ASCE), v. 33, n. 6 (November 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000556

  6. Gao, Ruolan / Liu, Jicai (2019): Selection of government supervision mode of PPP projects during the operation stage. In: Construction Management and Economics, v. 37, n. 10 (February 2019).

    https://doi.org/10.1080/01446193.2018.1564347

  7. Cheah, Charles Y. J. / Liu, Jicai (2006): Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. In: Construction Management and Economics, v. 24, n. 5 (May 2006).

    https://doi.org/10.1080/01446190500435572

  8. Liu, Jicai / Cheah, Charles Y. J. (2009): Real option application in PPP/PFI project negotiation. In: Construction Management and Economics, v. 27, n. 4 (April 2009).

    https://doi.org/10.1080/01446190902807071

  9. Liu, Jicai / Gao, Ruolan / Cheah, Charles Yuen Jen / Luo, Jian (2016): Evolutionary game of investors' opportunistic behaviour during the operational period in PPP projects. In: Construction Management and Economics, v. 35, n. 3 (October 2016).

    https://doi.org/10.1080/01446193.2016.1237033

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine