Scenario-Planning Method for Cost Estimation Using Morphological Analysis
Author(s): |
Sae-Hyun Ji
Joseph Ahn |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Advances in Civil Engineering, 2019, v. 2019 |
Page(s): | 1-10 |
DOI: | 10.1155/2019/4962653 |
Abstract: |
Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost. A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects. The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%. The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided. Furthermore, this method can provide a contingency plan to cushion against uncertainties. |
Copyright: | © 2019 Sae-Hyun Ji et al. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.43 MB
- About this
data sheet - Reference-ID
10300614 - Published on:
20/02/2019 - Last updated on:
02/06/2021