Scenario-Planning Method for Cost Estimation Using Morphological Analysis
Auteur(s): |
Sae-Hyun Ji
Joseph Ahn |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, 2019, v. 2019 |
Page(s): | 1-10 |
DOI: | 10.1155/2019/4962653 |
Abstrait: |
Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost. A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects. The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%. The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided. Furthermore, this method can provide a contingency plan to cushion against uncertainties. |
Copyright: | © 2019 Sae-Hyun Ji et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.43 MB
- Informations
sur cette fiche - Reference-ID
10300614 - Publié(e) le:
20.02.2019 - Modifié(e) le:
02.06.2021