0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The role of contract incompleteness factors in project disputes: a hybrid fuzzy multi-criteria decision approach

Author(s): ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 9, v. 30
Page(s): 3895-3926
DOI: 10.1108/ecam-11-2021-1020
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-11-2021-1020.
  • About this
    data sheet
  • Reference-ID
    10665179
  • Published on:
    09/05/2022
  • Last updated on:
    10/02/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine