The role of contract incompleteness factors in project disputes: a hybrid fuzzy multi-criteria decision approach
Auteur(s): |
Asli Pelin Gurgun
Kerim Koc |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, juin 2022, n. 9, v. 30 |
Page(s): | 3895-3926 |
DOI: | 10.1108/ecam-11-2021-1020 |
- Informations
sur cette fiche - Reference-ID
10665179 - Publié(e) le:
09.05.2022 - Modifié(e) le:
10.02.2024