0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rockburst and microseismic activity in a lagging tunnel as the spacing between twin TBM excavated tunnels changes: A case from the Neelum-Jhelum hydropower project

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.tust.2022.104884.
  • About this
    data sheet
  • Reference-ID
    10696672
  • Published on:
    10/12/2022
  • Last updated on:
    10/12/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine