Rockburst and microseismic activity in a lagging tunnel as the spacing between twin TBM excavated tunnels changes: A case from the Neelum-Jhelum hydropower project
Author(s): |
Peng-Xiang Li
Bing-Rui Chen Ya-Xun Xiao Guang-Liang Feng Yang-yi Zhou Jin-Shuai Zhao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, February 2023, v. 132 |
Page(s): | 104884 |
DOI: | 10.1016/j.tust.2022.104884 |
- About this
data sheet - Reference-ID
10696672 - Published on:
10/12/2022 - Last updated on:
10/12/2022