Rockburst and microseismic activity in a lagging tunnel as the spacing between twin TBM excavated tunnels changes: A case from the Neelum-Jhelum hydropower project
Auteur(s): |
Peng-Xiang Li
Bing-Rui Chen Ya-Xun Xiao Guang-Liang Feng Yang-yi Zhou Jin-Shuai Zhao |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, février 2023, v. 132 |
Page(s): | 104884 |
DOI: | 10.1016/j.tust.2022.104884 |
- Informations
sur cette fiche - Reference-ID
10696672 - Publié(e) le:
10.12.2022 - Modifié(e) le:
10.12.2022