Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefabrication Facility in Construction
Author(s): |
Jing Liu
Ming Lu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Computing in Civil Engineering, March 2019, n. 2, v. 33 |
Page(s): | 04018067 |
DOI: | 10.1061/(asce)cp.1943-5487.0000816 |
- About this
data sheet - Reference-ID
10263625 - Published on:
01/01/2019 - Last updated on:
01/01/2019