Robust Dual-Level Optimization Framework for Resource-Constrained Multiproject Scheduling for a Prefabrication Facility in Construction
Auteur(s): |
Jing Liu
Ming Lu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Computing in Civil Engineering, mars 2019, n. 2, v. 33 |
Page(s): | 04018067 |
DOI: | 10.1061/(asce)cp.1943-5487.0000816 |
- Informations
sur cette fiche - Reference-ID
10263625 - Publié(e) le:
01.01.2019 - Modifié(e) le:
01.01.2019