River-Diversion Intake Structures for the Mohale Dam, Lesotho

Author(s):

Medium: journal article
Language(s): English
Published in: Structural Engineering International, , n. 2, v. 10
Page(s): 85-86
DOI: 10.2749/101686600780557884
Abstract:

The design of Mohale Dam, a 145-m-high concrete-faced rockfill dam, commenced in January 1996, and the construction contract was awarded in March 1998. Construction began in June 1998, and initial work focused on the construction of two river-diversion tunnels and their associated structures, including the intake structures that are the subject of this article.