Risk-Reduction Credit for Very Early Warning Fire Detection at Nuclear Power Plants: From FAQ to Fiction

Author(s):
Medium: journal article
Language(s): English
Published in: Civil Engineering Journal, , n. 2, v. 5
Page(s): 309
DOI: 10.28991/cej-2019-03091246
Abstract:

In 2004, the U.S. Nuclear Regulatory Commission (NRC), with support from the commercial nuclear power industry, adopted the 2001 Edition of National Fire Protection Association (NFPA) Standard 805, “Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants,” as the means by which commercial nuclear power licensees could comply with Title 10 of the Code of Federal Regulations, Part 50.48(c), to replace deterministic fire protection licensing bases with ones that are risk-informed and performance-based.  To facilitate licensee “transitions” to the new licensing bases via NFPA 805, a “Frequently Asked Questions” (FAQs) program, established early during the pilot-plant phase, was expanded to enable use of consensus technical “short_cuts” for fire probabilistic risk assessment (PRA) methods.  These “Fire PRA FAQs” enabled licensees, with NRC approval, to bypass more traditional means of establishing acceptable PRA method enhancements on an interim basis, pending eventual confirmation by test programs and/or more detailed analyses.  The NRC approved several, of which perhaps the most substantial in providing risk reduction benefits was FAQ 08-0046 on “Incipient Fire Detection Systems,” more accurately characterized as “Very Early Warning Fire Detection Systems” (VEWFDSs).  Controversial from the start, the hidden story behind this FAQ’s initial adoption is relevant to examination of the NRC NUREG report that later replaced it and remains in effect today.  This article examines this backstory, tracing recommendations that were proposed and bypassed, then examines alternatives to the current guidance.  These alternatives, which maximize possible risk reduction credit for VEWFDSs at nuclear power plants, remain at least a factor of two less than the current peak NUREG-2180 risk-reduction factor even before the latter accounts for the possibility of fire pre-emption altogether.

Copyright: © 2019 Raymond HV Gallucci,
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

Structure Types

  • About this
    data sheet
  • Reference-ID
    10340807
  • Published on:
    14/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine