0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia

This publication lists 78 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10688401
  • Published on:
    13/08/2022
  • Last updated on:
    10/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine