0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia

This publication has been cited in the following 26 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10688401
  • Published on:
    13/08/2022
  • Last updated on:
    10/11/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine