Risk Caused by Construction of the Metro Shaft Adjacent to Building and its Control Measure
Author(s): |
Liyun Li
Zhongwang Qiu Yingying Dong Xiuli Du |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Procedia Engineering, 2016, v. 165 |
Page(s): | 40-48 |
DOI: | 10.1016/j.proeng.2016.11.733 |
- About this
data sheet - Reference-ID
10669577 - Published on:
03/06/2022 - Last updated on:
03/06/2022