Risk Caused by Construction of the Metro Shaft Adjacent to Building and its Control Measure
Auteur(s): |
Liyun Li
Zhongwang Qiu Yingying Dong Xiuli Du |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Procedia Engineering, 2016, v. 165 |
Page(s): | 40-48 |
DOI: | 10.1016/j.proeng.2016.11.733 |
- Informations
sur cette fiche - Reference-ID
10669577 - Publié(e) le:
03.06.2022 - Modifié(e) le:
03.06.2022