Resource-constrained repetitive project scheduling with soft logic
Author(s): |
Xin Zou
Zhuang Rong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-08-2022-0703 |
- About this
data sheet - Reference-ID
10755548 - Published on:
14/01/2024 - Last updated on:
14/01/2024