0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Research on Power Transmission Tower Planning Method Based on Real Terrain and Surface Feature

Author(s):




Medium: journal article
Language(s): English
Published in: Journal of Physics: Conference Series, , n. 1, v. 2503
Page(s): 012028
DOI: 10.1088/1742-6596/2503/1/012028
Abstract:

With the rapid development of power grid construction in China, the engineering construction conditions of overhead lines have changed. Further research is needed on the combination scheme of general design technical conditions of lines, tower planning, and design, etc., to meet the application requirements of the actual line projects in China for the general design of transmission line towers. This research adopts the pole and tower planning method that conforms to the real terrain and terrain conditions and considers the actual constraint information, such as the terrain, crossing trees, power lines, and railways, to carry out the planning and design of transmission line poles and towers.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1742-6596/2503/1/012028.
  • About this
    data sheet
  • Reference-ID
    10777402
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine