Research on Power Transmission Tower Planning Method Based on Real Terrain and Surface Feature

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Physics: Conference Series, , n. 1, v. 2503
Page(s): 012028
DOI: 10.1088/1742-6596/2503/1/012028
Abstrait:

With the rapid development of power grid construction in China, the engineering construction conditions of overhead lines have changed. Further research is needed on the combination scheme of general design technical conditions of lines, tower planning, and design, etc., to meet the application requirements of the actual line projects in China for the general design of transmission line towers. This research adopts the pole and tower planning method that conforms to the real terrain and terrain conditions and considers the actual constraint information, such as the terrain, crossing trees, power lines, and railways, to carry out the planning and design of transmission line poles and towers.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1088/1742-6596/2503/1/012028.
  • Informations
    sur cette fiche
  • Reference-ID
    10777402
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine