0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Requirements for developing production planning and control systems for engineer-to-order industrialized building systems

Author(s): ORCID (Interdisciplinar Department, Federal University of Rio Grande do Sul, Porto Alegre, Brazil)
ORCID (Civil Engineering Department, Federal University of Rio Grande do Sul, Porto Alegre, Brazil)
ORCID (Postgraduate Program in Civil Engineering: Construction and Infrastructrure, Federal University of Rio Grande do Sul, Porto Alegre, Brazil)
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 7-8, v. 40
Page(s): 1-15
DOI: 10.1080/01446193.2022.2062778
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2022.2062778.
  • About this
    data sheet
  • Reference-ID
    10663533
  • Published on:
    09/05/2022
  • Last updated on:
    13/08/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine