Requirements for developing production planning and control systems for engineer-to-order industrialized building systems
Auteur(s): |
Daniela Dietz Viana
(Interdisciplinar Department, Federal University of Rio Grande do Sul, Porto Alegre, Brazil)
Carlos Torres Formoso (Civil Engineering Department, Federal University of Rio Grande do Sul, Porto Alegre, Brazil) Fernanda Saidelles Bataglin (Postgraduate Program in Civil Engineering: Construction and Infrastructrure, Federal University of Rio Grande do Sul, Porto Alegre, Brazil) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, 17 juillet 2022, n. 7-8, v. 40 |
Page(s): | 1-15 |
DOI: | 10.1080/01446193.2022.2062778 |
- Informations
sur cette fiche - Reference-ID
10663533 - Publié(e) le:
09.05.2022 - Modifié(e) le:
13.08.2022