Fernanda Saidelles Bataglin
- Requirements for developing production planning and control systems for engineer-to-order industrialized building systems. Dans: Construction Management and Economics, v. 40, n. 7-8 (17 juillet 2022). (2022):
- (2020): Diretrizes para a definição de lotes de montagem de sistemas pré-fabricados de concreto do tipo engineer-to-order. Dans: Ambiente Construído, v. 20, n. 1 (mars 2020).
- BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order. Dans: Ambiente Construído, v. 18, n. 1 (mars 2018). (2018):
- Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 2 (février 2020). (2020):