0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Relate building information modeling to quality management according to the different quality management phases

Author(s):

Medium: journal article
Language(s): English
Published in: IOP Conference Series: Earth and Environmental Science, , n. 1, v. 1129
Page(s): 012043
DOI: 10.1088/1755-1315/1129/1/012043
Abstract:

Buildings are becoming larger and more complex in today’s world. As a result, the old method of personally inspecting a building’s design is no longer efficient, as it is time-consuming and labor-intensive. Establishing and automating systems for inspecting building quality is becoming increasingly crucial. Building Information modeling (BIM) enables for quick decision-making and evaluation by automatically verifying if buildings meet standards. In this case. Real-time quality control and early fault detection are still the most effective methods for decreasing project schedule and expense overrun in the construction process. Current quality control methods on construction sites are inefficient and time-consuming since they only offer data at specified locations and times to reflect the work in progress, limiting a quality manager’s ability to quickly identify and handle faults. The goal of this research is to show how important BIM is in quality management in terms of its many phases. (inspection, control, and quality assurance).

License:

This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10780442
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine