Relate building information modeling to quality management according to the different quality management phases
Autor(en): |
Asser Elsheikh
Shaimaa Ghanim Hakim Alamedy |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | IOP Conference Series: Earth and Environmental Science, 1 Januar 2023, n. 1, v. 1129 |
Seite(n): | 012043 |
DOI: | 10.1088/1755-1315/1129/1/012043 |
Abstrakt: |
Buildings are becoming larger and more complex in today’s world. As a result, the old method of personally inspecting a building’s design is no longer efficient, as it is time-consuming and labor-intensive. Establishing and automating systems for inspecting building quality is becoming increasingly crucial. Building Information modeling (BIM) enables for quick decision-making and evaluation by automatically verifying if buildings meet standards. In this case. Real-time quality control and early fault detection are still the most effective methods for decreasing project schedule and expense overrun in the construction process. Current quality control methods on construction sites are inefficient and time-consuming since they only offer data at specified locations and times to reflect the work in progress, limiting a quality manager’s ability to quickly identify and handle faults. The goal of this research is to show how important BIM is in quality management in terms of its many phases. (inspection, control, and quality assurance). |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 3.0 (CC-BY 3.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.98 MB
- Über diese
Datenseite - Reference-ID
10780442 - Veröffentlicht am:
12.05.2024 - Geändert am:
12.05.2024